LlamaPo Construction Ltd: Difference between revisions
From The Shire
(Added lines) |
(→Lines) |
||
Line 8: | Line 8: | ||
LlamaPo has constructed, and now maintains, several railway lines across The Shire. These include: | LlamaPo has constructed, and now maintains, several railway lines across The Shire. These include: | ||
* The [[Aether Line]] from [[Equos County]] to [[Venezia Valeria Railway Station|Venezia Nuova]] | * The [[Aether Line]] from [[Equos County]] to [[Venezia Valeria Railway Station|Venezia Nuova]] | ||
* The high-speed 'University Connect' [[Franco Line]] between [[Venezia Cipriana Railway Station|Venezia Nuova]] and [[Lythia University]] | |||
* The [[Juris Line]] from [[Brunswick Central Railway Station|Brunswick]] to [[Babylon Railway Station|Babylon]] | |||
* The [[Venezia Overground]] circular route around central [[Venezia Nuova]] | * The [[Venezia Overground]] circular route around central [[Venezia Nuova]] | ||
* The [[Zelos Line]] from [[Homestar Port]] to [[Falore]] | * The [[Zelos Line]] from [[Homestar Port]] to [[Falore]] | ||
The company is presently working on | The company is presently working on 4 new railway lines, each at varying stages of development: | ||
* The [[Dulcia Line]] from [[Venezia Cipriana Railway Station|Venezia Nuova]] to [[Alqualonde]] | |||
** Services currently operate on this line between [[Venezia Cipriana Railway Station|Venezia Nuova]] and [[FridayFunLand]], whilst construction work continues between [[FridayFunLand]] and [[Alqualonde]] | |||
* The [[Empire Line]] from [[Sunspear]] to [[Clarisse]] or [[Pitfall]] | * The [[Empire Line]] from [[Sunspear]] to [[Clarisse]] or [[Pitfall]] | ||
** Discussions are currently being held over the possibility of extending the [[Clarisse]] spur of the [[Empire Line]] to settlements in the South-East corner of The Shire | ** Discussions are currently being held over the possibility of extending the [[Clarisse]] spur of the [[Empire Line]] to settlements in the South-East corner of The Shire | ||
* The [[Nysa Line]] from [[Venezia Toria Railway Station|Venezia Nuova]] to [[Laurelian]] or [[Valashu]] | * The [[Nysa Line]] from [[Venezia Toria Railway Station|Venezia Nuova]] to [[Laurelian]] or [[Valashu]] | ||
** This line currently runs from [[Venezia Toria Railway Station]] to [[Athitica]] whilst construction work is ongoing between [[Athitica]] and the two termini | ** This line currently runs from [[Venezia Toria Railway Station]] to [[Athitica]] whilst construction work is ongoing between [[Athitica]] and the two termini | ||
* The [[Venezia Metro]] outer and inner loops, which will enable rail travel between all mainline stations within the city | * The [[Venezia Metro]] outer and inner loops, which will enable rail travel between all mainline stations within the city | ||
** This project is still in its planning phase. Work is expected to begin in September 2015 | ** This project is still in its planning phase. Work is expected to begin in September 2015 |
Revision as of 19:28, 25 August 2015
LlamaPo Construction Ltd. Is a subsidiary of the Venezia Nuova Group. It is responsible for the construction and upkeep of several items of railway infrastructure across The Shire.
Stations
LlamaPo manages several stations across The Shire, some of which are:
Lines
LlamaPo has constructed, and now maintains, several railway lines across The Shire. These include:
- The Aether Line from Equos County to Venezia Nuova
- The high-speed 'University Connect' Franco Line between Venezia Nuova and Lythia University
- The Juris Line from Brunswick to Babylon
- The Venezia Overground circular route around central Venezia Nuova
- The Zelos Line from Homestar Port to Falore
The company is presently working on 4 new railway lines, each at varying stages of development:
- The Dulcia Line from Venezia Nuova to Alqualonde
- Services currently operate on this line between Venezia Nuova and FridayFunLand, whilst construction work continues between FridayFunLand and Alqualonde
- The Empire Line from Sunspear to Clarisse or Pitfall
- Discussions are currently being held over the possibility of extending the Clarisse spur of the Empire Line to settlements in the South-East corner of The Shire
- The Nysa Line from Venezia Nuova to Laurelian or Valashu
- This line currently runs from Venezia Toria Railway Station to Athitica whilst construction work is ongoing between Athitica and the two termini
- The Venezia Metro outer and inner loops, which will enable rail travel between all mainline stations within the city
- This project is still in its planning phase. Work is expected to begin in September 2015