User: Dh28551/KKArch/MR/2026-10: Difference between revisions

From The Shire
Jump to: navigation, search
Dh28551 (talk | contribs)
No edit summary
Dh28551 (talk | contribs)
No edit summary
Line 12: Line 12:
==== Work Systems Report ====
==== Work Systems Report ====
'''WORK TARGETS'''
'''WORK TARGETS'''
# On tracked monthly vows:
* On tracked monthly vows:
## 300 tracked ideas and 90 tracked mini-experiments: '''DONE''', with ....
** 300 tracked ideas and 90 tracked mini-experiments: '''DONE''', with ....
## 1st pack of 6 tracked hours of creative work + a product/prototype for a scalable project: '''DONE''', with ....
** 1st pack of 6 tracked hours of creative work + a product/prototype for a scalable project: '''DONE''', with 6 hours + a product: ["Inner Resistance.." https://www.instagram.com/p/DeA5GkUEgVr/?img_index=1]
## 2nd pack of 6 tracked hours of creative work + a product/prototype for a scalable project: '''DONE''', with ....
** 2nd pack of 6 tracked hours of creative work + a product/prototype for a scalable project: '''DONE''', with 6 hours + ADDED 4,75 hrs + a product: ["Two Things.." https://wartakelana.substack.com/p/in-creativity-there-are-two-things]
# On monthly...
* On observations of work pivot: apparently pivots are not enough as it can be complicated due to, among other things, fluctuating desire for specific work types, lack of tracking need, fragility of work desire overall...
* There are several other work system experimentations done during this month. Including:
** Reformatting of work category time log from 1 category/30 minutes to 1 category/15 minutes
** Mapping of demotivation and burnout (for meditation exercise suggestions)
** Social candidness within KK Org.
** Unfiltering the amount of work experiments
<hr>
<hr>
'''WORK ANALYSIS'''
'''WORK ANALYSIS'''
Su
<hr>
<hr>
'''FUTURE PLANS'''
'''FUTURE PLANS'''
<hr>
<hr>

Revision as of 07:06, 30 October 2026

This is still a draft.

This is the Complete Monthly Report for October 2026, the first of its kind in a Karya Kelana administering body. Monthly Report duties have been delegated completely to the Division of Metasystems to ensure report centralization.

Solemn Vow Report

On October 2026, Karya Kelana Org. has completed 45% of the projects demanded by the Solemn Vow.

Details:

  1. 3 projects of benefit (66%): 1 completed = 22%
  2. 10 more articles for & around Cactus County (22%): 5 completed = 11%
  3. 2 buildings for Warta Kelana and Workers' Union (12%): 2 completed = 12%

Work Systems Report

WORK TARGETS

  • On tracked monthly vows:
  • On observations of work pivot: apparently pivots are not enough as it can be complicated due to, among other things, fluctuating desire for specific work types, lack of tracking need, fragility of work desire overall...
  • There are several other work system experimentations done during this month. Including:
    • Reformatting of work category time log from 1 category/30 minutes to 1 category/15 minutes
    • Mapping of demotivation and burnout (for meditation exercise suggestions)
    • Social candidness within KK Org.
    • Unfiltering the amount of work experiments

WORK ANALYSIS Su


FUTURE PLANS