User: Dh28551/KKArch/Misc-001: Difference between revisions

From The Shire
Jump to: navigation, search
Dh28551 (talk | contribs)
No edit summary
Dh28551 (talk | contribs)
No edit summary
Line 44: Line 44:
|}
|}


The details of each divisions' work are listed below, by year and month. Abbreviations are used: '''(LW)''' for large work (25 WU each), '''(MW)''' for medium work (5 WU each), and '''(SW)''' for small work (1 WU each).
The details of each divisions' work (as well as their previous forms) are listed below, by year and month. Abbreviations are used: '''(LW)''' for large work (25 WU each), '''(MW)''' for medium work (5 WU each), and '''(SW)''' for small work (1 WU each).
== 2026 ==
== 2026 ==
=== October ===
=== October ===

Revision as of 16:29, 22 October 2026

Welcome to the Karya Kelana Divisions' Monthly Work Log! This log is managed by the Division of Metasystems, Karya Kelana Organization. This is based on the discussions around a very pivotal meeting on July 24, 2026, which built a collective understanding that divisions in the Organization are created to ensure accountability towards specific works. There is also a rising preference to keep the names short to make them more memorable and practical.

Currently, there are four divisions in the Karya Kelana Organization: Division of Knowledge, Division of Infrastructure, Division of General Affairs, and Division of Metasystems. Their scope of works are defined below:

Division of.... Scope of work
Knowledge (KNO) Wiki documentation; knowledge-based research and campaigns (excluding metasystems-related works); library; text-based document archives
Infrastructure (INF) Buildings; roads; landscaping/terraforming; infrastructural contracts and collaborations; Kelanan territory mapping
General Affairs (GAF) Internal relations; diplomacy; multiversal affairs; regulation drafting and archiving; events and venues; enterprises; tech support; procurement of non-categorized goods and services; other non-categorized activities (excluding innovation)
Metasystems (MTS) Research, experimentation, iteration, and system-building of work and social systems within KK Org; work reports; non-categorized innovation (including incubators)

Since October 2026, the divisions are strongly encouraged to register at least one work each month as a way to indicate the divisions' functionality. However, divisions can be exempted from this if a force majeure occurs and is sufficient to significantly halt operations.

To ensure division accountability, We created a table listing the status of monthly work for each division, based on accumulated work units (WU). The status will be divided into four: LL in green (#b7e1cd) for months with large-scale workload (at least 40 WU), ML in yellow (#fce8b2) for months with medium-scale workload (at least 15 WU), SL in red (#f4c7c3) for months with small-scale workload (at least 1 WU), empty white for no work at all, and empty black for periods when the division is non-existent.

Month
(yyyy-mm)
KNO INF GAF MTS Notes
2026-10 SL ML ML ML

The details of each divisions' work (as well as their previous forms) are listed below, by year and month. Abbreviations are used: (LW) for large work (25 WU each), (MW) for medium work (5 WU each), and (SW) for small work (1 WU each).

2026

October

Division of Knowledge
Status: SL (Small-scale Workload). Categories: 1 x (MW), 1 x (SW) = 6 WU

  • (MW) Co-wrote [Article 01] draft with Permata Kelana for its All-Nations Wiki Project
  • (SW) Coordinated affairs around the discovery of the Monolith of the Philosopher, including Karya Kelana membership in the Society of Monolith Studies

Division of Infrastructure
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 5 x (SW) = 20 WU

  • (MW) Constructed Khalduni Ave. and its landscape
  • (MW) Constructed the Museum of Kelanan Map History, as well as its first map
  • (MW) Planted and landscaped trees for the peninsular waterway's riverside, north section
  • (SW) Completed construction of Lagoon North Rd.
  • (SW) Completed construction of Lagoon East Rd.
  • (SW) Made a podium on the Philosopher's Hill
  • (SW) Made the pelinggih padmasana shrine for KK's future Balinese temple
  • (SW) Widening the road to Alpha Pyramid

Division of General Affairs
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 5 x (SW) = 20 WU

  • (MW) Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate
  • (MW) Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes
  • (MW) Supported the Permata Kelana Exp. Conference of Discovery
  • (SW) Made the September Monthly Report
  • (SW) Drafted Regulatory Announcement no. 2026/10/06/01: Kelana Orders
  • (SW) Drafted Regulatory Announcement no. 2026/10/11/01: Karya Kelana Org. Announces Structural Changes
  • (SW) Drafted Regulatory Announcement no. 2026/10/16/01: Karya Kelana Solemn Vow Fulfillment through Indirect Means
  • (SW) Mediated the support for Permata Kelana Exp.'s All-Nations Wiki Project, from the Division of Knowledge to Permata Kelana Expedition

Division of Metasystems
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 4 x (SW) = 19 WU

  • (MW) Made the September Monthly Work Systems Report
  • (MW) Created the Karya Kelana Divisions' Monthly Work Log
  • (MW) Catch-all track-and-control of the number of ideas, experiments, creative work hours, and other estabilished activities
  • (SW) Released the Letters of Metasystems, pt 001: "In creativity, there are two things that are not your job" and submitted it to Warta Kelana
  • (SW) Experimenting with reformatting of work category time log from 1 category/30 minutes to 1 category/15 minutes
  • (SW) Experimenting with mapping of demotivation and burnout (for meditation exercise suggestions)
  • (SW) Experimenting with social candidness within KK Org.