User: Dh28551/KKArch/Misc-001: Difference between revisions

From The Shire
Jump to: navigation, search
Dh28551 (talk | contribs)
No edit summary
Dh28551 (talk | contribs)
No edit summary
Line 15: Line 15:
|-
|-
! General Affairs (GAF)
! General Affairs (GAF)
| Relations and diplomacy at the internal, external, and multiversal levels; drafting of regulations; events and venues; enterprises; procurement of non-categorized goods and services; other non-categorized activities (excluding innovation)
| Relations and diplomacy at the internal, external, and multiversal levels; drafting of regulations; events and venues; enterprises; tech support; procurement of non-categorized goods and services; other non-categorized activities (excluding innovation)
|-
|-
! Metasystems (MTS)
! Metasystems (MTS)

Revision as of 16:02, 22 October 2026

Welcome to the Karya Kelana Divisions' Monthly Work Log! This log is managed by the Division of Metasystems, Karya Kelana Organization. This is based on the discussions around a very pivotal meeting on July 24, 2026, which built a collective understanding that divisions in the Organization are created to ensure accountability towards specific works. There is also a rising preference to keep the names short to make them more memorable and practical.

Currently, there are four divisions in the Karya Kelana Organization: Division of Knowledge, Division of Infrastructure, Division of General Affairs, and Division of Metasystems. Their scope of works are defined below:

Division of.... Scope of work
Knowledge (KNO) Wiki documentation; knowledge-based research and campaigns (excluding metasystems-related works); library; text-based document archives
Infrastructure (INF) Buildings; roads; landscaping/terraforming; infrastructural contracts and collaborations; Kelanan territory mapping
General Affairs (GAF) Relations and diplomacy at the internal, external, and multiversal levels; drafting of regulations; events and venues; enterprises; tech support; procurement of non-categorized goods and services; other non-categorized activities (excluding innovation)
Metasystems (MTS) Research, experimentation, iteration, and system-building of work and social systems within KK Org; work reports; non-categorized innovation (including incubators)

Since October 2026, the divisions are strongly encouraged to register at least one work each month as a way to indicate the divisions' functionality. However, divisions can be exempted from this if a force majeure occurs and is sufficient to significantly halt operations.

To ensure division accountability, We created a table listing the status of monthly work for each division, based on accumulated work units (WU). The status will be divided into four: LL in green (#b7e1cd) for months with large-scale workload (at least 40 WU), ML in yellow (#fce8b2) for months with medium-scale workload (at least 15 WU), SL in red (#f4c7c3) for months with small-scale workload (at least 1 WU), empty white for no work at all, and empty black for periods when the division is non-existent.

Month
(yyyy-mm)
KNO INF GAF MTS Notes
2026-10 SL ML ML ML

The details of each divisions' work are listed below, by year and month. Abbreviations are used: (LW) for large work (25 WU each), (MW) for medium work (5 WU each), and (SW) for small work (1 WU each).

2026

October

Division of Knowledge
Status: SL (Small-scale Workload). Categories: 1 x (MW), 1 x (SW) = 6 WU

  • (MW) Co-wrote [Article 01] draft with Permata Kelana for its All-Nations Wiki Project
  • (SW) Coordinated affairs around the discovery of the Monolith of the Philosopher, including Karya Kelana membership in the Society of Monolith Studies

Division of Infrastructure
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 4 x (SW) = 19 WU

  • (MW) Constructed Khalduni Ave. and its landscape
  • (MW) Constructed the Museum of Kelanan Map History, as well as its first map
  • (MW) Planted and landscaped trees for the peninsular waterway's riverside, north section
  • (SW) Completed construction of Lagoon North Rd.
  • (SW) Completed construction of Lagoon East Rd.
  • (SW) Made a podium on the Philosopher's Hill
  • (SW) Made the pelinggih padmasana shrine for KK's future Balinese temple

Division of General Affairs
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 5 x (SW) = 20 WU

  • (MW) Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate
  • (MW) Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes
  • (MW) Supported the Permata Kelana Exp. Conference of Discovery
  • (SW) Made the September Monthly Report
  • (SW) Drafted Regulatory Announcement no. 2026/10/06/01: Kelana Orders
  • (SW) Drafted Regulatory Announcement no. 2026/10/11/01: Karya Kelana Org. Announces Structural Changes
  • (SW) Drafted Regulatory Announcement no. 2026/10/16/01: Karya Kelana Solemn Vow Fulfillment through Indirect Means
  • (SW) Mediated the support for Permata Kelana Exp.'s All-Nations Wiki Project, from the Division of Knowledge to Permata Kelana Expedition

Division of Metasystems
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 4 x (SW) = 19 WU

  • (MW) Made the September Monthly Work Systems Report
  • (MW) Created the Karya Kelana Divisions' Monthly Work Log
  • (MW) Catch-all track-and-control of the number of ideas, experiments, creative work hours, and other estabilished activities
  • (SW) Released the Letters of Metasystems, pt 001: "In creativity, there are two things that are not your job" and submitted it to Warta Kelana
  • (SW) Experimenting with reformatting of work category time log from 1 category/30 minutes to 1 category/15 minutes
  • (SW) Experimenting with mapping of demotivation and burnout (for meditation exercise suggestions)
  • (SW) Experimenting with social candidness within KK Org.