User: Dh28551/KKArch/Misc-001: Difference between revisions
No edit summary |
No edit summary |
||
| Line 39: | Line 39: | ||
|style="background-color: #fce8b2;"|'''ML''' | |style="background-color: #fce8b2;"|'''ML''' | ||
|style="background-color: #fce8b2;"|'''ML''' | |style="background-color: #fce8b2;"|'''ML''' | ||
|style="background-color: # | |style="background-color: #f4c7c3;"|'''SL''' | ||
| | | | ||
|- | |- | ||
|} | |} | ||
The details of each divisions' work are listed below, by year and month. Abbreviations are used: '''(LW)''' for large work, ''(MW)'' for medium work, and (SW) for small work. | The details of each divisions' work are listed below, by year and month. Abbreviations are used: '''(LW)''' for large work, '''(MW)''' for medium work, and '''(SW)''' for small work. | ||
== 2026 == | == 2026 == | ||
=== October === | === October === | ||
'''Division of Knowledge''' | '''Division of Knowledge''' | ||
* (SW) Coordinated affairs around the discovery of the Monolith of the Philosopher, including Karya Kelana membership in the Syllogos Lithon | <br>Status: '''SL''' (Small-scale Workload). Categories: 1 x '''(SW)''' | ||
* '''(SW)''' Coordinated affairs around the discovery of the Monolith of the Philosopher, including Karya Kelana membership in the Syllogos Lithon | |||
'''Division of Infrastructure''' | '''Division of Infrastructure''' | ||
* ''(MW)'' Constructed Khaduni Ave. and its landscape | <br>Status: '''ML''' (Medium-scale Workload). Categories: 3 x '''(MW)''', 2 x '''(SW)''' | ||
* ''(MW)'' Constructed the Museum of Kelanan Map History, as well as its first map | * '''(MW)''' Constructed Khaduni Ave. and its landscape | ||
* ''(MW)'' Planted and landscaped trees for the peninsular waterway's riverside | * '''(MW)''' Constructed the Museum of Kelanan Map History, as well as its first map | ||
* (SW) Completed construction of Lagoon North Rd. | * '''(MW)''' Planted and landscaped trees for the peninsular waterway's riverside | ||
* (SW) Made a podium on the Philosopher's Hill | * '''(SW)''' Completed construction of Lagoon North Rd. | ||
* '''(SW)''' Made a podium on the Philosopher's Hill | |||
'''Division of General Affairs''' | '''Division of General Affairs''' | ||
* (SW) Made the September Monthly Report | <br>Status: '''ML''' (Medium-scale Workload). Categories: 3 x '''(MW)''', 5 x '''(SW)''' | ||
* (SW) Drafted Regulatory Announcement no. 2026/10/06/01: Kelana Orders | * '''(SW)''' Made the September Monthly Report | ||
* ''(MW)'' Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate | * '''(SW)''' Drafted Regulatory Announcement no. 2026/10/06/01: Kelana Orders | ||
* (SW) Drafted Regulatory Announcement no. 2026/10/11/01: Karya Kelana Org. Announces Structural Changes | * '''(MW)''' Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate | ||
* ''(MW)'' Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes | * '''(SW)''' Drafted Regulatory Announcement no. 2026/10/11/01: Karya Kelana Org. Announces Structural Changes | ||
* (SW) Drafted Regulatory Announcement no. 2026/10/16/01: Karya Kelana Solemn Vow Fulfillment through Indirect Means | * '''(MW)''' Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes | ||
* ''(MW)'' Supported the Permata Kelana Exp. Conference of Discovery | * '''(SW)''' Drafted Regulatory Announcement no. 2026/10/16/01: Karya Kelana Solemn Vow Fulfillment through Indirect Means | ||
* (SW) Mediated the support for All-Nations Wiki Project, from the Division of Knowledge to Permata Kelana Expedition | * '''(MW)''' Supported the Permata Kelana Exp. Conference of Discovery | ||
* '''(SW)''' Mediated the support for All-Nations Wiki Project, from the Division of Knowledge to Permata Kelana Expedition | |||
'''Division of Metasystems''' | '''Division of Metasystems''' | ||
* ''(MW)'' Made the September Monthly Work Systems Report | <br>Status: '''SL''' (Small-scale Workload). Categories: 2 x '''(MW)''', 1 x '''(SW)''' | ||
* (SW) Released the Letters of Metasystems, pt 001: "In creativity, there are two things that are not your job" and submitted it to Warta Kelana | * '''(MW)''' Made the September Monthly Work Systems Report | ||
* ''(MW)'' Created the Karya Kelana Divisions' Monthly Work Log | * '''(SW)''' Released the Letters of Metasystems, pt 001: "In creativity, there are two things that are not your job" and submitted it to Warta Kelana | ||
* '''(MW)''' Created the Karya Kelana Divisions' Monthly Work Log | |||
Revision as of 01:51, 21 October 2026
Welcome to the Karya Kelana Divisions' Monthly Work Log! This log is managed by the Division of Metasystems, Karya Kelana Organization. This is based on the discussions around a very pivotal meeting on July 24, 2026, which built a collective understanding that divisions in the Organization are created to ensure accountability towards specific works. There is also a rising preferences to keep the names short to make them more memorable and practical.
Currently, there are four divisions in the Karya Kelana Organization: Division of Knowledge, Division of Infrastructure, Division of General Affairs, and Division of Metasystems. Their scope of works are defined below:
| Division of.... | Scope of work |
|---|---|
| Knowledge (KNO) | Wiki documentation; knowledge-based research and campaigns (excluding metasystems-related works); library; text-based document archives |
| Infrastructure (INF) | Buildings; roads; landscaping/terraforming; infrastructural contracts and collaborations; cartographic works |
| General Affairs (GAF) | Relations and diplomacy at the internal, external, and multiversal levels; drafting of regulations; events and venues; enterprises; procurement of non-infrastructural goods and services; other non-categorized activities (excluding innovation) |
| Metasystems (MTS) | Research, experimentation, iteration, and system-building of Kelanan work and social systems; work reports; non-categorized innovation (including incubators) |
The divisions are strongly encouraged to at least have a proof of work each month since October 2026 as a way to indicate the divisions' functionality. However, divisions can be exempted from this if a force majeure occurs and is sufficient to significantly halt operations.
To ensure division accountability, We created a table listing the status of monthly work for each division. The status will be divided into four: LL in green (#b7e1cd) for months with large-scale workload, ML in yellow (#fce8b2) for months with medium-scale workload, SL in red (#f4c7c3) for months with small-scale workload, empty for no work at all, and black for periods when the division is non-existent.
| Month (yyyy-mm) |
KNO | INF | GAF | MTS | Notes |
|---|---|---|---|---|---|
| 2026-10 | SL | ML | ML | SL |
The details of each divisions' work are listed below, by year and month. Abbreviations are used: (LW) for large work, (MW) for medium work, and (SW) for small work.
2026
October
Division of Knowledge
Status: SL (Small-scale Workload). Categories: 1 x (SW)
- (SW) Coordinated affairs around the discovery of the Monolith of the Philosopher, including Karya Kelana membership in the Syllogos Lithon
Division of Infrastructure
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 2 x (SW)
- (MW) Constructed Khaduni Ave. and its landscape
- (MW) Constructed the Museum of Kelanan Map History, as well as its first map
- (MW) Planted and landscaped trees for the peninsular waterway's riverside
- (SW) Completed construction of Lagoon North Rd.
- (SW) Made a podium on the Philosopher's Hill
Division of General Affairs
Status: ML (Medium-scale Workload). Categories: 3 x (MW), 5 x (SW)
- (SW) Made the September Monthly Report
- (SW) Drafted Regulatory Announcement no. 2026/10/06/01: Kelana Orders
- (MW) Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate
- (SW) Drafted Regulatory Announcement no. 2026/10/11/01: Karya Kelana Org. Announces Structural Changes
- (MW) Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes
- (SW) Drafted Regulatory Announcement no. 2026/10/16/01: Karya Kelana Solemn Vow Fulfillment through Indirect Means
- (MW) Supported the Permata Kelana Exp. Conference of Discovery
- (SW) Mediated the support for All-Nations Wiki Project, from the Division of Knowledge to Permata Kelana Expedition
Division of Metasystems
Status: SL (Small-scale Workload). Categories: 2 x (MW), 1 x (SW)
- (MW) Made the September Monthly Work Systems Report
- (SW) Released the Letters of Metasystems, pt 001: "In creativity, there are two things that are not your job" and submitted it to Warta Kelana
- (MW) Created the Karya Kelana Divisions' Monthly Work Log