User: Dh28551/KKArch/MR/2026-10: Difference between revisions
No edit summary |
No edit summary |
||
| (16 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
This is the '''Complete Monthly Report''' for October 2026, the first of its kind in a Karya Kelana administering body. Monthly Report duties have been delegated completely to the Division of Metasystems to ensure report centralization. | This is the '''Complete Monthly Report''' for October 2026, the first of its kind in a Karya Kelana administering body. Monthly Report duties have been delegated completely to the Division of Metasystems to ensure report centralization. | ||
==== Solemn Vow Report ==== | ==== Solemn Vow Report ==== | ||
On October 2026, Karya Kelana Org. has completed '''45%''' of the projects demanded by the Solemn Vow. | On October 2026, Karya Kelana Org. has completed '''45%''' of the projects demanded by the Solemn Vow, a 4.4% increase from last month. | ||
Details: | Details: | ||
| Line 12: | Line 11: | ||
==== Work Systems Report ==== | ==== Work Systems Report ==== | ||
'''WORK TARGETS''' | '''WORK TARGETS''' | ||
* On tracked monthly vows: | |||
** 300 tracked ideas and 90 tracked mini-experiments: '''DONE''', with .... | |||
** 1st pack of 6 tracked hours of creative work + a product/prototype for a scalable project: '''DONE''', with 6 hours + a product: [https://www.instagram.com/p/DeA5GkUEgVr/?img_index=1 "Inner Resistance.."] | |||
** 2nd pack of 6 tracked hours of creative work + a product/prototype for a scalable project: '''DONE''', with 6 hours + ADDED 4,75 hrs + a product: [https://wartakelana.substack.com/p/in-creativity-there-are-two-things "Two Things.." ] | |||
* On Solemn Vow targets: | |||
** The Cactus County Wiki Expedition has added two more articles: [[Governance of Karya Kelana]] and [[Rykdwyn]]. | |||
** Three potential programs to fulfill the "three sizable projects with recorded benefit to others" clause has been opened or reopened: the ORIGINS campaign, the All-Shire Wiki Wanderings, and the All-Nations Wiki Program (of Permata Kelana Expedition). | |||
* On observations of work pivot: apparently pivots are not enough as it can be complicated due to, among other things, fluctuating desire for specific work types, lack of tracking need, and overall fragility of work desire. | |||
* There are several other work system experimentations done during this month. Including: | |||
** Reformatting of work category time log from 1 category/30 minutes to 1 category/15 minutes | |||
** Mapping of demotivation and burnout (for meditation exercise suggestions) | |||
** Social candidness within KK Org. | |||
** Unfiltering the amount of work experiments | |||
<hr> | <hr> | ||
'''WORK ANALYSIS''' | '''WORK ANALYSIS''' | ||
Surprisingly, there is no specific instance of a major burnout that needs a formal call to rests; sporadic burnout and rests are recorded, but only 2 sporadic days for each. Due to this, there is no significant obstacle in reaching our work targets. | |||
The most promising work experiment is "unfiltering the amount of work experiments". Despite being merely performed in a day, it has created 22 recorded experiments on a single day (October 30), the most of any day in KK Org.'s experiment record. | |||
<hr> | <hr> | ||
'''FUTURE PLANS''' | '''FUTURE PLANS''' | ||
We have enacted monthly target vows: | |||
# 300 ideas and 90 exps (ignore "purity" of ideas/experiments) | |||
# 3 days of 15-experiments' instances OR 1 day of 20-experiments' instances.<br>A day may count up to 27 hours. | |||
# 12 tracked hours of creative work. | |||
Penalties are kept confidential and stored in the Ancestral Earth. However, the penalties can be nulled by any work leave-worthy sickness or common-sense force majeure (personal or societal) affecting 7 days/more in the month. | |||
Outside of the monthly vow, we, the Division of Metasystems, hope to create more work experiments and continue to work on the project of "unfiltering the amount of work experiments". | |||
We also shifted our priorities from scalable work to Solemn Vow-related work. | |||
<hr> | <hr> | ||
==== All-Division Report ==== | |||
The Division of Metasystems has launched the [[User:Dh28551/KKArch/Misc-001|Monthly Work Log]] system, and here are the assessment of each division along with their major projects. | |||
* The work of The Division of Knowledge is rated '''Small-Scale Workload (SL)''' with 14 Work Units. Among its major projects are: | |||
** Co-wrote [Article 01] draft with Permata Kelana Exp. for its All-Nations Wiki Project | |||
** Wrote the [[Governance of Karya Kelana]] wiki article | |||
* The work of The Division of Infrastructure is rated '''Medium-Scale Workload (ML)''' with 22 Work Units. Among its major projects are: | |||
** Constructed Khalduni Ave. and its landscape | |||
** Constructed the Museum of Kelanan Map History, as well as its first map | |||
** Planted and landscaped trees for the peninsular waterway's riverside, north section | |||
* The work of The Division of General Affairs is rated '''Medium-Scale Workload (ML)''' with 25 Work Units. Among its major projects are: | |||
** Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate | |||
** Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes | |||
** Compiled Regulatory Announcements full list to [[User:Dh28551/KKArch/Law]] along with the copying of 9 Regulatory Announcements to the [[User:Dh28551/KKArch/Law-2026]] archive | |||
** Supported the Permata Kelana Exp. Conference of Discovery | |||
* The work of The Division of Metasystems is rated '''Medium-Scale Workload (ML)''' with 16 Work Units. Among its major projects are: | |||
** Made the September 2026 Monthly Work Systems Report + Tracked and monitored activities in October 2026 | |||
** Created and monitored the Karya Kelana Divisions' Monthly Work Log | |||
<hr> | |||
==== Summary ==== | |||
We would like to announce that: | |||
# We reformatted the monthly reports: summary reports are posted on Discord, complete reports are stored in wiki archives. The complete report for October 2026 is here: [https://wiki.shirecraft.us/index.php?title=User:Dh28551/KKArch/MR/2026-10] | |||
# The fulfillment of Solemn Vow targets has reached 45%< a 4.4% increase from the previous month. | |||
# All targets of October's monthly vow has been reached: 300 ideas, 90 experiments, 12 tracked hours of creative work, and two products for scalable projects. | |||
# The most promising Metasystems' project is the "unfiltering the amount of work experiments," where 22 experiments are recorded in a single day. | |||
# KK Org. Divisions now log their works to the Divisons' Monthly Work Log ([https://wiki.shirecraft.us/index.php?title=User:Dh28551/KKArch/Misc-001]) | |||
# Div. of Knowledge gains the "Small-Scale Workload" (SL) rating, while Div. of Infrastructure, Div. of General Affairs, and Div. of Metasystems gain the "Medium-Scale Workload" (ML) rating. | |||
Signed,<br> | |||
Priscilla Magbanua<br> | |||
Division of Metasystems<br> | |||
Karya Kelana Org.<br> | |||
November 1, 2026<br> | |||
Latest revision as of 04:34, 1 November 2026
This is the Complete Monthly Report for October 2026, the first of its kind in a Karya Kelana administering body. Monthly Report duties have been delegated completely to the Division of Metasystems to ensure report centralization.
Solemn Vow Report
On October 2026, Karya Kelana Org. has completed 45% of the projects demanded by the Solemn Vow, a 4.4% increase from last month.
Details:
- 3 projects of benefit (66%): 1 completed = 22%
- 10 more articles for & around Cactus County (22%): 5 completed = 11%
- 2 buildings for Warta Kelana and Workers' Union (12%): 2 completed = 12%
Work Systems Report
WORK TARGETS
- On tracked monthly vows:
- 300 tracked ideas and 90 tracked mini-experiments: DONE, with ....
- 1st pack of 6 tracked hours of creative work + a product/prototype for a scalable project: DONE, with 6 hours + a product: "Inner Resistance.."
- 2nd pack of 6 tracked hours of creative work + a product/prototype for a scalable project: DONE, with 6 hours + ADDED 4,75 hrs + a product: "Two Things.."
- On Solemn Vow targets:
- The Cactus County Wiki Expedition has added two more articles: Governance of Karya Kelana and Rykdwyn.
- Three potential programs to fulfill the "three sizable projects with recorded benefit to others" clause has been opened or reopened: the ORIGINS campaign, the All-Shire Wiki Wanderings, and the All-Nations Wiki Program (of Permata Kelana Expedition).
- On observations of work pivot: apparently pivots are not enough as it can be complicated due to, among other things, fluctuating desire for specific work types, lack of tracking need, and overall fragility of work desire.
- There are several other work system experimentations done during this month. Including:
- Reformatting of work category time log from 1 category/30 minutes to 1 category/15 minutes
- Mapping of demotivation and burnout (for meditation exercise suggestions)
- Social candidness within KK Org.
- Unfiltering the amount of work experiments
WORK ANALYSIS
Surprisingly, there is no specific instance of a major burnout that needs a formal call to rests; sporadic burnout and rests are recorded, but only 2 sporadic days for each. Due to this, there is no significant obstacle in reaching our work targets.
The most promising work experiment is "unfiltering the amount of work experiments". Despite being merely performed in a day, it has created 22 recorded experiments on a single day (October 30), the most of any day in KK Org.'s experiment record.
FUTURE PLANS
We have enacted monthly target vows:
- 300 ideas and 90 exps (ignore "purity" of ideas/experiments)
- 3 days of 15-experiments' instances OR 1 day of 20-experiments' instances.
A day may count up to 27 hours. - 12 tracked hours of creative work.
Penalties are kept confidential and stored in the Ancestral Earth. However, the penalties can be nulled by any work leave-worthy sickness or common-sense force majeure (personal or societal) affecting 7 days/more in the month.
Outside of the monthly vow, we, the Division of Metasystems, hope to create more work experiments and continue to work on the project of "unfiltering the amount of work experiments".
We also shifted our priorities from scalable work to Solemn Vow-related work.
All-Division Report
The Division of Metasystems has launched the Monthly Work Log system, and here are the assessment of each division along with their major projects.
- The work of The Division of Knowledge is rated Small-Scale Workload (SL) with 14 Work Units. Among its major projects are:
- Co-wrote [Article 01] draft with Permata Kelana Exp. for its All-Nations Wiki Project
- Wrote the Governance of Karya Kelana wiki article
- The work of The Division of Infrastructure is rated Medium-Scale Workload (ML) with 22 Work Units. Among its major projects are:
- Constructed Khalduni Ave. and its landscape
- Constructed the Museum of Kelanan Map History, as well as its first map
- Planted and landscaped trees for the peninsular waterway's riverside, north section
- The work of The Division of General Affairs is rated Medium-Scale Workload (ML) with 25 Work Units. Among its major projects are:
- Drafted Regulatory Announcement no. 2026/10/07/01: Recipients of Kelana Order of Great Merit and Kelana Order of Great Service, October 7, 2026, including the graphic design of the Kelana Orders certificate
- Drafted Regulatory Announcement no. 2026/10/12/01: Nomenclature and Structural Changes
- Compiled Regulatory Announcements full list to User:Dh28551/KKArch/Law along with the copying of 9 Regulatory Announcements to the User:Dh28551/KKArch/Law-2026 archive
- Supported the Permata Kelana Exp. Conference of Discovery
- The work of The Division of Metasystems is rated Medium-Scale Workload (ML) with 16 Work Units. Among its major projects are:
- Made the September 2026 Monthly Work Systems Report + Tracked and monitored activities in October 2026
- Created and monitored the Karya Kelana Divisions' Monthly Work Log
Summary
We would like to announce that:
- We reformatted the monthly reports: summary reports are posted on Discord, complete reports are stored in wiki archives. The complete report for October 2026 is here: [1]
- The fulfillment of Solemn Vow targets has reached 45%< a 4.4% increase from the previous month.
- All targets of October's monthly vow has been reached: 300 ideas, 90 experiments, 12 tracked hours of creative work, and two products for scalable projects.
- The most promising Metasystems' project is the "unfiltering the amount of work experiments," where 22 experiments are recorded in a single day.
- KK Org. Divisions now log their works to the Divisons' Monthly Work Log ([2])
- Div. of Knowledge gains the "Small-Scale Workload" (SL) rating, while Div. of Infrastructure, Div. of General Affairs, and Div. of Metasystems gain the "Medium-Scale Workload" (ML) rating.
Signed,
Priscilla Magbanua
Division of Metasystems
Karya Kelana Org.
November 1, 2026