User: Dh28551/KKArch/MR/2026-09: Difference between revisions

From The Shire
Jump to: navigation, search
Dh28551 (talk | contribs)
Created page with "== Monthly Work Systems Report: Aug 2026 Recap == '''WORK TARGETS'''<br> There are two targets need fulfilled in August: '''300 tracked ideas and 90 tracked mini-experiments'''<br> Done (V) 418 ideas and 90 mini-experiments<br> Ideas include tracked questions to trigger creativity '''6 tracked hours of works toward completing the Vow and 3 units of any of these: 1 product/prototype for Vow completion and/or 2 Cactus County Wiki Expedition articles'''<br> Done (V) 6 tr..."
 
Dh28551 (talk | contribs)
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Monthly Work Systems Report: Aug 2026 Recap ==
== Monthly Report: September 2026 ==
On August 2026, Karya Kelana Org. has completed '''40.6%''' of the projects demanded by the Solemn Vow.
 
Details:
# 3 projects of benefit (66%): 1 completed = 22%
# 10 more articles for & around Cactus County (22%): 3 completed = 6.6%
# 2 buildings for Warta Kelana and Workers' Union (12%): 2 completed = 12%
 
Notes: Nothing has changed since Aug 26. More details on Monthly Work Systems Report for Sep 26.
 
Signed,<br>
Nicodeamus Sagala<br>
Division of General Affairs<br>
Karya Kelana Org.<br>
October 1, 2026
 
== Monthly Work Systems Report: Sep 2026 Recap ==


'''WORK TARGETS'''<br>
'''WORK TARGETS'''<br>
There are two targets need fulfilled in August:
There is one work target demanded in September:


'''300 tracked ideas and 90 tracked mini-experiments'''<br>
'''6 tracked hours of works toward making a scalable project, as well as a product/prototype, and a report with at least one full page describing actions on the project'''<br>
Done (V) 418 ideas and 90 mini-experiments<br>
Done (V) 6 tracked hours, 2 product/prototype, 1 full-page report.<br>
Ideas include tracked questions to trigger creativity
Products are: a Substack/Medium article about creative resistance and an Instagram post showcasing stations.<br>
The finished report is undisclosed to the public.


'''6 tracked hours of works toward completing the Vow and 3 units of any of these: 1 product/prototype for Vow completion and/or 2 Cactus County Wiki Expedition articles'''<br>
----------
Done (V) 6 tracked hours and 4 units:<br>
# 2 wiki articles (https://wiki.shirecraft.us/index.php?title=Cactus_County_(state) and https://wiki.shirecraft.us/index.php?title=Pryzm_Sanctuary), credited to the Division of Innovation and Knowledge
# The Mizuhama Kelana Library (in *[other server redacted]*), credited to the Permata Kelana Expedition with the assistance of KK Org.'s Division of General Affairs
# Cemetery of the Loreful (in *[other server redacted]*), credited to the Permata Kelana Expedition with the assistance of KK Org.'s Division of General Affairs
# Every Library a Lectern program, credited to the Division of Innovation and Knowledge (with the help of the Great Library of Terumbu Nagaram)<br>
------------


'''WORK ANALYSIS'''<br>
'''WORK ANALYSIS'''<br>
Despite all targets fulfilled, there are some problems, in order:
Despite target fulfillment, our progress for solemn vow has not increased from August. This should have been a concern, except there was a *force majeure* in the form of a disease epidemic across southern part of the Cactus County region, which affected Karya Kelana around September 8th-17th. This resulted in less time to be allocated to other projects such as Cactus County Wiki Expedition.
 
However, despite the health crisis, as well as apparent burnout at the end of August, we managed to finish the "6 tracked hours of works toward making a scalable project" vow target. This is thanks to creative optimism among Kelanans stemming from several factors:
# Monthly idea and experiment streaks in the last 4 months (June-September)
# Sustained habit of strolling around on foot
# Widespread interest on books regarding greater purpose and daily rituals


'''Collective Burnout'''<br>
----------
Each target contributes to the burnout, but especially the mini-experiments' target. We suspect that the problem is not so much on rest (which was given adequately), but on the disconnection with meaning and greater purpose. However, the mismatch of rest might also play a part.


'''Inadequate Solemn Vow Progress'''<br>
August merely brought 4.4% of Solemn Vow progress (lower than the standard 8.33%), which is a concern in itself. And before the target gets fulfilled, the people are having a burnout.
Eventually we have to understand that by-target fulfillment, if forced, would be counterproductive, and that most of its progress comes from the lucky streak of a sizable project getting a review that it is beneficial.<br>
------------
'''FUTURE ACTIONS'''<br>
'''FUTURE ACTIONS'''<br>
In the moment, we would not force work targets for September (this may change). If willing, Kelanans can abandon the "6 tracked hours of works toward making a scalable project" vow target and opt for paying penalties in the Ancestral World instead.
To return to normalcy, we have enacted monthly target vows:
 
# 300 tracked ideas and 90 tracked mini-experiments
What we suggest Kelanans to do, and especially the Work Systems Laboratory Division (as well as volunteers external to the division) should do, is to make a form of research on burnout, appropriate rest, and greater purpose.
# 1st pack of 6 tracked hours of creative work + a product/prototype for a scalable project
# 2nd pack of 6 tracked hours of creative work + a product/prototype for a scalable project


This is not a vow, but please report on this by the next Monthly Work System Report.
We would also like to observe ways to shift/pivot creative works in a sustainable way. Since the Kelanan populace tend to be less productive when merely given a single job, we decided that it might be better to build a sustainable system of work pivots. However, this is not a target and thus allowed to be unobserved if circumstances do not accommodate it.


Signed,<br>
Signed,<br>
Line 37: Line 49:
Division of Work Systems Laboratory<br>
Division of Work Systems Laboratory<br>
Karya Kelana Org.<br>
Karya Kelana Org.<br>
August 31, 2026
October 1, 2026

Latest revision as of 01:33, 27 October 2026

Monthly Report: September 2026

On August 2026, Karya Kelana Org. has completed 40.6% of the projects demanded by the Solemn Vow.

Details:

  1. 3 projects of benefit (66%): 1 completed = 22%
  2. 10 more articles for & around Cactus County (22%): 3 completed = 6.6%
  3. 2 buildings for Warta Kelana and Workers' Union (12%): 2 completed = 12%

Notes: Nothing has changed since Aug 26. More details on Monthly Work Systems Report for Sep 26.

Signed,
Nicodeamus Sagala
Division of General Affairs
Karya Kelana Org.
October 1, 2026

Monthly Work Systems Report: Sep 2026 Recap

WORK TARGETS
There is one work target demanded in September:

6 tracked hours of works toward making a scalable project, as well as a product/prototype, and a report with at least one full page describing actions on the project
Done (V) 6 tracked hours, 2 product/prototype, 1 full-page report.
Products are: a Substack/Medium article about creative resistance and an Instagram post showcasing stations.
The finished report is undisclosed to the public.


WORK ANALYSIS
Despite target fulfillment, our progress for solemn vow has not increased from August. This should have been a concern, except there was a *force majeure* in the form of a disease epidemic across southern part of the Cactus County region, which affected Karya Kelana around September 8th-17th. This resulted in less time to be allocated to other projects such as Cactus County Wiki Expedition.

However, despite the health crisis, as well as apparent burnout at the end of August, we managed to finish the "6 tracked hours of works toward making a scalable project" vow target. This is thanks to creative optimism among Kelanans stemming from several factors:

  1. Monthly idea and experiment streaks in the last 4 months (June-September)
  2. Sustained habit of strolling around on foot
  3. Widespread interest on books regarding greater purpose and daily rituals

FUTURE ACTIONS
To return to normalcy, we have enacted monthly target vows:

  1. 300 tracked ideas and 90 tracked mini-experiments
  2. 1st pack of 6 tracked hours of creative work + a product/prototype for a scalable project
  3. 2nd pack of 6 tracked hours of creative work + a product/prototype for a scalable project

We would also like to observe ways to shift/pivot creative works in a sustainable way. Since the Kelanan populace tend to be less productive when merely given a single job, we decided that it might be better to build a sustainable system of work pivots. However, this is not a target and thus allowed to be unobserved if circumstances do not accommodate it.

Signed,
Priscilla Magbanua
Division of Work Systems Laboratory
Karya Kelana Org.
October 1, 2026